- Design Studio 3.0 Manual
- Commissioning an Installation
- Creating an Installation
-
Getting Started
-
Commissioning an Installation
- Commissioning Workflow
- Creating an Installation
- Managing N4 Hubs
- Building Groups
- Adding Devices
- Dividing Linear Runs Into Groups
- Using the Color Picker
- Managing Lighting Power-Restore States
- Building Scenes
- Building Shows
- Programming Ketra Keypads
- Enabling Sensor Control
- Enabling Emergency Lighting
- Integrating Third-Party Lighting
- All Analog Integration Profiles
- DMX Integration
- Integrating with Lutron
- Publishing: Saving Configurations to Devices
-
Maintaining an Installation
-
Saving Your Progress
-
Troubleshooting
-
Appendices
Next Steps
After creating the installation, you should be ready to commission.
What do I do next?
1. Check the Toggling API Authentication section of this manual, to see whether you need to enable authentication on your N4 Hubs. (Requires communication with hubs)
2. If the network’s IT administrator has requested that the N4s be assigned static IP addresses or custom DNS addresses, see the relevant sections in Toggling API Authentication. (Requires communication with hubs)
3. Start building groups. See Building Groups.