- Design Studio 3.0 Manual
- Commissioning an Installation
- Enabling Sensor Control
-
Getting Started
-
Commissioning an Installation
- Commissioning Workflow
- Creating an Installation
- Managing N4 Hubs
- Building Groups
- Adding Devices
- Dividing Linear Runs Into Groups
- Using the Color Picker
- Managing Lighting Power-Restore States
- Building Scenes
- Building Shows
- Programming Ketra Keypads
- Enabling Sensor Control
- Enabling Emergency Lighting
- Integrating Third-Party Lighting
- All Analog Integration Profiles
- DMX Integration
- Integrating with Lutron
- Publishing: Saving Configurations to Devices
-
Maintaining an Installation
-
Saving Your Progress
-
Troubleshooting
-
Appendices
Enabling Sensor Control
In a Ketra Only installation, the Ketra system can take input from sensors via wired connection to an N3 Satellite’s Analog I/O ports. Wiring should be completed by a licensed electrician prior to commissioning.
After wiring has been completed, you still need to configure the N3 Satellite in Design Studio. This section discusses configuration of occupancy sensors, vacancy sensors, and photocells.